Within AAWSAP Role
What did BAASS actually deliver to DIA?
The strongest public record for BAASS is not an alien case but contract paperwork showing reports, plans and positive early DIA reviews.
On this page
- Monthly reports and project plans
- The 26 research reports by June 2009
- What positive contract reviews do and do not prove
Page outline Jump by section
Introduction
One of the strongest pieces of evidence supporting Colm Kelleher’s claim to have been centrally involved in a real government-funded programme is not a UFO sighting, a whistleblower story, or a Skinwalker Ranch account. It is the paper trail showing that Bigelow Aerospace Advanced Space Studies (BAASS) produced formal contract deliverables for the Defense Intelligence Agency (DIA) under the Advanced Aerospace Weapon System Applications Program (AAWSAP).
Those records matter because they establish something often lost in public debate: BAASS was not merely telling stories about secret investigations. It was operating under a documented federal contract with reporting requirements, technical studies, project plans and performance reviews. At the same time, the existence of deliverables does not automatically validate every extraordinary claim later associated with BAASS personnel. The key credibility question is narrower: what did BAASS actually deliver, how did DIA evaluate that work, and what does that prove about Kelleher and the programme’s reliability?
What did BAASS actually deliver to DIA?
The public record shows that AAWSAP was structured as a contractor programme with defined outputs rather than an informal exploratory effort. Documents released through Freedom of Information Act requests describe a system of project management plans, monthly reporting and technical research products delivered to DIA under contract HHM402-08-C-0072. [defense]media.defense.govDOPSR 2024 0263 AARO HISTORICAL RECORD REPORT VOLUME 1 2024Historical Record Report Volume 18 Mar 2024 — SECTION I: Introduction. This report represents Volume I of the All-domain Anomaly Resoluti…
This is significant for credibility because it moves discussion away from later memoirs and interviews and into verifiable procurement documentation. Whatever one thinks of BAASS’s later claims about anomalous phenomena, the company was expected to produce measurable work products that could be reviewed by government officials.
The available records indicate that DIA tracked contractor performance through routine mechanisms familiar to government acquisition programmes. Rather than showing a purely speculative UFO project, the paperwork presents a contractor being assessed against reporting and research obligations. [defense]media.defense.govDOPSR 2024 0263 AARO HISTORICAL RECORD REPORT VOLUME 1 2024Historical Record Report Volume 18 Mar 2024 — SECTION I: Introduction. This report represents Volume I of the All-domain Anomaly Resoluti…
For Kelleher, who has publicly described himself as a senior BAASS manager involved in executing the DIA contract, this documentation supports the basic claim that he participated in a structured government-funded effort. It does not, however, establish that all conclusions reached by BAASS investigators were correct.
Monthly reports and project plans
Among the most concrete items in the released records are references to extensive monthly status reports and multiple project management plans.
A DIA contract-status document states that BAASS performance had been “excellent” and that the company was in full compliance with contract requirements. The same document notes that DIA had received extensive monthly status reports and that twelve project management plans had been received and executed. [The Black Vault]documents2.theblackvault.comThe Black VaultAerospace Contract Status- 12 project management plans received and executed. 1III. - 26 detailed research reports (twice…
Those details are easy to overlook because they sound bureaucratic. Yet they are important precisely because they are ordinary. They indicate that BAASS was not simply generating ad hoc UFO files. The company was producing the kind of programme-management documentation expected in many government contracts.
The existence of those reports does not reveal everything that was inside them. Much remains unavailable to the public, heavily redacted, or only partially leaked. But the record demonstrates that DIA was receiving continuing contractor output rather than merely funding a vague concept. [The Black Vault]documents2.theblackvault.comThe Black VaultAerospace Contract Status- 12 project management plans received and executed. 1III. - 26 detailed research reports (twice…
For assessing Kelleher’s credibility, this distinction matters. Critics sometimes portray AAWSAP-era claims as retrospective mythmaking. Supporters sometimes imply that government funding itself validates extraordinary conclusions. The reporting record supports neither extreme. Instead, it shows a contractor relationship with documented deliverables and oversight mechanisms.
The 26 research reports by June 2009
The most frequently cited metric in the public record is the production of twenty-six technical research reports.
Several DIA documents state that by 30 June 2009 BAASS had delivered twenty-six detailed research reports, described as twice the minimum requirement expected under the contract. One contract-status briefing states that reviews of the reports had been “overwhelmingly positive”. [defense]media.defense.govDOPSR 2024 0263 AARO HISTORICAL RECORD REPORT VOLUME 1 2024Historical Record Report Volume 18 Mar 2024 — SECTION I: Introduction. This report represents Volume I of the All-domain Anomaly Resoluti…
Another DIA memorandum prepared during discussion of Senator Harry Reid’s request for Special Access Program protections similarly records that DIA had received all twenty-six papers by July 2009. [defense]media.defense.govDOPSR 2024 0263 AARO HISTORICAL RECORD REPORT VOLUME 1 2024Historical Record Report Volume 18 Mar 2024 — SECTION I: Introduction. This report represents Volume I of the All-domain Anomaly Resoluti…
The existence of these reports has become an important part of the AAWSAP credibility debate because they are tangible outputs. They are not merely recollections from former programme participants. They are referenced in official documents produced during the programme’s lifetime.
The reports themselves covered a range of advanced aerospace and future-technology subjects. Publicly released examples include studies on propulsion concepts, advanced materials, energy systems and other speculative aerospace topics. The original contract language focused on future aerospace threats and breakthrough technologies rather than explicitly advertising a UFO investigation programme. [defense]media.defense.govDOPSR 2024 0263 AARO HISTORICAL RECORD REPORT VOLUME 1 2024Historical Record Report Volume 18 Mar 2024 — SECTION I: Introduction. This report represents Volume I of the All-domain Anomaly Resoluti…
This creates an important nuance. The strongest documentary evidence for BAASS is not evidence of alien craft. It is evidence that BAASS produced a substantial body of contracted research work and delivered it on schedule.
Why positive reviews are often overstated
Supporters of Kelleher and AAWSAP frequently point to DIA’s positive comments about contractor performance. Those comments are real.
The August 2009 contract-status briefing states that BAASS performance was excellent, that deliverables had been received, and that reviews of the research reports were overwhelmingly positive. DIA also exercised an option year for continued work, subject to funding. [The Black Vault]documents2.theblackvault.comThe Black VaultAerospace Contract Status- 12 project management plans received and executed. 1III. - 26 detailed research reports (twice…
Taken at face value, those statements undermine claims that BAASS simply failed to perform or never produced meaningful outputs. Government officials were evidently satisfied enough with programme execution to continue funding activity beyond the initial phase. [defense]media.defense.govDOPSR 2024 0263 AARO HISTORICAL RECORD REPORT VOLUME 1 2024Historical Record Report Volume 18 Mar 2024 — SECTION I: Introduction. This report represents Volume I of the All-domain Anomaly Resoluti…
However, positive contract reviews do not necessarily mean the underlying scientific or intelligence conclusions were validated.
Government programme reviews often assess whether deliverables were completed, whether contract requirements were met, whether reports were professionally produced and whether milestones were achieved. They are not equivalent to proving that every hypothesis in those reports was correct.
This distinction is especially important in discussions of UAP claims. A positive review can demonstrate that BAASS completed assigned work. It cannot by itself demonstrate that anomalous events were genuinely non-human, that recovered materials existed, or that extraordinary interpretations were accepted by the wider intelligence community.
What later DIA reviews suggest
One of the most revealing parts of the documentary record is what happened when senior officials reviewed the programme’s outputs in late 2009.
Documents released through FOIA show that DIA conducted technical reviews of the deliverables. According to briefing material prepared during Senator Reid’s effort to obtain Special Access Program status for AAWSAP, programme leadership concluded there was no justification for granting special-access protections based on the content of the delivered reports or anticipated future work. [Metabunk]metabunk.orgpage 2AARO's Historical UAP Report - Volume 1.Read more…
James Clapper, then serving as Under Secretary of Defense for Intelligence, ultimately recommended against establishing a Special Access Program for AAWSAP. The memorandum specifically references review of the technical reports before reaching that conclusion. [defense]media.defense.govDOPSR 2024 0263 AARO HISTORICAL RECORD REPORT VOLUME 1 2024Historical Record Report Volume 18 Mar 2024 — SECTION I: Introduction. This report represents Volume I of the All-domain Anomaly Resoluti…
This is one of the most important balancing facts in the entire credibility discussion.
On one hand, the documents support Kelleher’s position that BAASS was conducting real work for DIA and delivering substantial research products. On the other hand, the same record suggests that senior reviewers did not see the deliverables as providing sufficient grounds for extraordinary compartmentalisation or special programme status. [defense]media.defense.govDOPSR 2024 0263 AARO HISTORICAL RECORD REPORT VOLUME 1 2024Historical Record Report Volume 18 Mar 2024 — SECTION I: Introduction. This report represents Volume I of the All-domain Anomaly Resoluti…
That outcome does not prove the research was worthless. Nor does it prove extraordinary claims were true but ignored. It simply shows that higher-level reviewers did not conclude that the material justified the level of protection being sought.
What the deliverables say about Colm Kelleher’s credibility
The BAASS deliverable record is probably the strongest documentary support for Kelleher’s credibility in the UAP field.
It demonstrates several points that can be independently verified:
- BAASS held a genuine DIA contract under AAWSAP. [defense]media.defense.govDOPSR 2024 0263 AARO HISTORICAL RECORD REPORT VOLUME 1 2024Historical Record Report Volume 18 Mar 2024 — SECTION I: Introduction. This report represents Volume I of the All-domain Anomaly Resoluti…
- BAASS submitted recurring reports, plans and technical studies. [The Black Vault]documents2.theblackvault.comThe Black VaultAerospace Contract Status- 12 project management plans received and executed. 1III. - 26 detailed research reports (twice…
- DIA formally tracked and reviewed those deliverables. [defense]media.defense.govDOPSR 2024 0263 AARO HISTORICAL RECORD REPORT VOLUME 1 2024Historical Record Report Volume 18 Mar 2024 — SECTION I: Introduction. This report represents Volume I of the All-domain Anomaly Resoluti…
- Contemporary government records described contractor performance positively. [The Black Vault]documents2.theblackvault.comThe Black VaultAerospace Contract Status- 12 project management plans received and executed. 1III. - 26 detailed research reports (twice…
Those facts make it difficult to dismiss Kelleher as someone with no institutional connection to government UAP-related work.
At the same time, the same documents impose limits on what can reasonably be claimed. They verify programme activity and contractor performance, not the truth of every later assertion associated with BAASS, Skinwalker Ranch investigations, alleged biological effects cases, or stories about recovered materials. The strongest evidence supports Kelleher’s access and involvement. It is much weaker as proof of the more extraordinary conclusions sometimes linked to the programme.
The result is a mixed but important credibility picture. The BAASS paperwork strengthens Kelleher’s standing as a genuine participant in a documented DIA-funded effort. It does not remove the need to evaluate individual UFO and anomalous-phenomena claims on their own evidence. The deliverables show that work was done and reviewed. They do not settle what that work ultimately proved.
Amazon book picks
Further Reading
Books and field guides related to What did BAASS actually deliver to DIA?. Use these as the next step if you want deeper reading beyond the article.
The UFO Experience
Useful context for evaluating evidence standards and research outputs.
Skinwalkers at the Pentagon
Discusses reports, outputs, and claimed accomplishments of AAWSAP.
Endnotes
-
Source: dia.mil
Link: https://www.dia.mil/FOIA/FOIA-Electronic-Reading-Room/FileId/170018/Source snippet
Defense Intelligence AgencyAdvanced Aerospace Weapon System Applications ContractMarch 3, 2022 — 26 detailed research reports (twice mini...
Published: March 3, 2022
-
Source: dia.mil
Title: FOIA Request Log 2022
Link: https://www.dia.mil/Portals/110/Documents/FOIA/All%20PDFs/FOIA_Request_Log_2022.pdfSource snippet
Defense Intelligence AgencyFOIA Request Log 202218 Jan 2024 — AAWSAP Contract HHM402-08-C-072 Bigelow Aerospace Advanced. Space Studies (...
-
Source: dia.mil
Link: https://www.dia.mil/FOIA/FOIA-Electronic-Reading-Room/FileId/237660/Source snippet
Defense Intelligence AgencySenator Harry Reid's Request to Put the AdvanApril 28, 2025 — 17 Nov 2009 — The AAITP that SEN Reid refers to...
Published: April 28, 2025
-
Source: metabunk.org
Title: page 2
Link: https://www.metabunk.org/threads/baass-ten-month-report-2009-leaked-document.14241/page-2Source snippet
AARO's Historical UAP Report - Volume 1.Read more...
-
Source: dia.mil
Title: FY 2023 FOIA Log
Link: https://www.dia.mil/Portals/110/FY%202023%20FOIA%20Log.pdfSource snippet
pdf17 Feb 2026 — AAWSAP program, including those related to advanced aerospace technologies or UP... Aerospace / Bigelow Aerospace Advan...
-
Source: dia.mil
Title: FOIA Request Log 2018
Link: https://www.dia.mil/Portals/110/Documents/FOIA/All%20PDFs/FOIA_Request_Log_2018.pdfSource snippet
FOIA LOG Fiscal Year 2018 1. Oct 201730 Sept 2018 — annual reports provided by Robert Bigelow. Bigelow Aerospace, or Bigelow Aerospace...
-
Source: dia.mil
Title: FOIA Request Log 2021
Link: https://www.dia.mil/Portals/110/Documents/FOIA/All%20PDFs/FOIA_Request_Log_2021.pdfSource snippet
Request ID Requester Name Received Date...2 Apr 2024 — 4/26/2021. Records/communications 1/1/2005 - 12/31/2013 concerning Harry Reid. B...
-
Source: dia.mil
Title: FOIA Request Log 2020
Link: https://www.dia.mil/Portals/110/Documents/FOIA/All%20PDFs/FOIA_Request_Log_2020.pdfSource snippet
11 Apr 2024 — 3/12/2020 Aerospace Advanced Space Studies" also known as "BAASS" and the DIA from. 2006 to March Sch 2020. Granted/Denied...
-
Source: dia.mil
Title: FOIA Request Log 2019
Link: https://www.dia.mil/Portals/110/Documents/FOIA/All%20PDFs/FOIA_Request_Log_2019.pdfSource snippet
Aerospace Space Studies (BAASS) from 1998- to the present.Read more...
-
Source: dia.mil
Title: FOIA Request Log 2019.2
Link: https://www.dia.mil/Portals/110/Documents/FOIA/All%20PDFs/FOIA_Request_Log_2019.2.pdfSource snippet
FOIA Request Log 201910/2/2018. 10/2/2018. Requesting all contracts undertaken with and funding provided to Bigalow. Advanced Aerospace S...
-
Source: media.defense.gov
Title: DOPSR 2024 0263 AARO HISTORICAL RECORD REPORT VOLUME 1 2024
Link: https://media.defense.gov/2024/Mar/08/2003409233/-1/-1/0/DOPSR-2024-0263-AARO-HISTORICAL-RECORD-REPORT-VOLUME-1-2024.PDFSource snippet
Historical Record Report Volume 18 Mar 2024 — SECTION I: Introduction. This report represents Volume I of the All-domain Anomaly Resoluti...
-
Source: metabunk.org
Title: claim the cia blocked the transfer of meta materials from crashed ufos.13773
Link: https://www.metabunk.org/threads/claim-the-cia-blocked-the-transfer-of-meta-materials-from-crashed-ufos.13773/Source snippet
Claim: The CIA Blocked the Transfer of Meta-materials...19 Nov 2024 — The $22M allocated for DIA AAWSAP, after speaking to multiple indi...
-
Source: metabunk.org
Title: AAR O’s Historical UAP Report
Link: https://www.metabunk.org/threads/aaros-historical-uap-report-volume-1.13375/Source snippet
AARO's Historical UAP Report - Volume 19 Mar 2024 — AARO's review of Project BLUE BOOK cases shows a spike in reported UAP sightings from...
-
Source: documents2.theblackvault.com
Link: https://documents2.theblackvault.com/documents/dia/AAWSAP/Contract_Status_24Aug09.pdfSource snippet
The Black VaultAerospace Contract Status- 12 project management plans received and executed. 1III. - 26 detailed research reports (twice...
Additional References
-
Source: scribd.com
Link: https://www.scribd.com/document/874653430/Baass-Ten-Month-Report-2009Source snippet
BAASS Ten Month Progress Report | PDFThe document is a ten-month report detailing the establishment and progress of the BAASS organizatio...
-
Source: facebook.com
Link: https://www.facebook.com/WIONews/posts/us-governments-now-defunct-advanced-aerospace-threat-identification-program-aati/2029675127243112/Source snippet
US government's now-defunct Advanced Aerospace Threat...US government's now-defunct Advanced Aerospace Threat Identification Program (AA...
-
Source: aaro.mil
Link: https://www.aaro.mil/UAP-Cases/Official-UAP-Imagery/Source snippet
UAP ImageryThis unresolved report contributes to AARO's historical and locational trend analyses. PR-017, Unresolved UAP Report, Europe 2...
-
Source: reddit.com
Title: I Was A Private Contractor for Various Do D Agencies
Link: https://www.reddit.com/r/UFOs/comments/1kh91tq/i_was_a_private_contractor_for_various_dod/Source snippet
I Was A Private Contractor for Various DoD Agencies - I am...The June-2009 BAASS status sheet says: “Designed an underground... • Any m...
-
Source: reddit.com
Title: serious full baass july 30th 2009 tenmonth report
Link: https://www.reddit.com/r/aliens/comments/1l0ndw8/serious_full_baass_july_30th_2009_tenmonth_report/Source snippet
SERIOUS: Full BAASS July 30th, 2009 Ten-Month Report...We now have the full 2009 BAASS aka Bigelow Aerospace Advanced Space Studies 472...
-
Source: reddit.com
Link: https://www.reddit.com/r/UFOs/comments/1l0n88f/full_baass_july_30th_2009_tenmonth_report_and/Source snippet
Full BAASS July 30th, 2009 Ten-Month Report and 140-...We now have the full 2009 BAASS aka Bigelow Aerospace Advanced Space Studies 472...
-
Source: ufos-scientificresearch.blogspot.com
Title: more baass [aawsap documents]({{ ‘aawsap-gap-184c1c/’ | relative_url }}) emerge
Link: https://ufos-scientificresearch.blogspot.com/2025/06/more-baass-aawsap-documents-emerge.htmlSource snippet
5 Jun 2025 — A 79 page report titled "BAASS Quality Review 2009" dated 30 October 2009, subject DIA review of Advanced Aerospace contract...
Published: October 2009
-
Source: academia.edu
Title: On the AAWSAP [AATIP Confusion]({{ ‘aatip-confusion-b857ff/’ | relative_url }})
Link: https://www.academia.edu/121609473/On_the_AAWSAP_AATIP_ConfusionSource snippet
(PDF) On the AAWSAP/AATIP Confusion30 Jun 2024 — The AARO historical report summarizes the timing issue as follows: AAWSAP/AATIP was term...
-
Source: scribd.com
Link: https://www.scribd.com/document/710227000/aawsap-Baass-mufon-Document-Collection-2008-2009Source snippet
BAASS Agreement for Technical Reports | PDF | IndemnityThe critical decision date for the June, 2009 Performance Review shall be June 26...
-
Source: marcellocatalano.com
Link: https://www.marcellocatalano.com/aaro.htmSource snippet
UFOs - Excerpts from AARO's reports - Marcello CatalanoAn AARO interviewee claimed in a thirdhand account that an organization was in pos...
Topic Tree